Stamped Energy
Industrial heat treatment furnace
← All case studies
Process optimizationReference benchmark

Heat treatment: weekend furnace holding waste

Batch furnaces held temperature over empty weekends, 15–25% of furnace energy with no parts scheduled. Holding schedules aligned to production calendar.

−18%

Non-prod energy

−60%

Weekend holding

₹3–6L

Monthly savings

Client & context

Commercial heat treatment shop, batch furnaces, quench tanks, and ageing ovens serving forging and automotive clients.

The challenge

Furnaces maintained soak temperature through weekends because operators feared long re-heat times Monday morning, but production schedules showed 40% of weekends had zero batches.

Our approach

  • Correlated furnace holding registers with production calendar and customer dispatch data.

  • Prescribed safe ramp-down windows when no batches were scheduled within 36 hours.

  • Set Monday pre-heat sequences timed to first confirmed batch, not fixed clock time.

Outcomes

  • 18% reduction in non-production furnace energy within 60 days.

  • 60% reduction in weekend holding hours when no batches scheduled.

  • ₹3–6L monthly savings without capital expenditure.

Reference benchmark from heat treatment segment pilots.

See it on your plant

Start with a pilot, verify on the next bill

We connect to existing meters and plant data. One verified saving before you commit to annual subscription.